Industrial electrical and automation · Kartal, Istanbul 0216 375 19 91info@pikotomasyon.comTR / EN
REFERENCES

Delivered. Running.

From UNDP, World Bank and EU/UN-funded projects to private-sector production plants — 18 projects, all standing on site. Each was commissioned with Pik Otomasyon engineering.

UNDP

Haspolat Septage Receiving Facility, Northern Cyprus

The electrical and automation works of this facility, which receives 30,000 m³ of septage per day, were delivered by a single contractor: from the MV kiosk substation and generator to the main distribution and MCC panels, and the PLC and SCADA software.

Electrical infrastructureMV kiosk substationGeneratorMDBMCCPLCSCADAPartner: Mono Arıtma
30,000 m³/day
receiving capacity
Nicosia, Northern Cyprus

Güzelyurt Biological Wastewater Treatment Plant, Northern Cyprus

Biological domestic wastewater treatment plant. The scope included 4 × 25 kW CHP units, a belt press and the plant's PLC and SCADA system.

CHP 4 × 25 kWBelt pressPLCSCADAPartner: Temser Çelik · Gökşin İnşaat – Instal Warszawa
2,700 m³/day
treatment capacity
Güzelyurt, Northern Cyprus
World Bank

Gazimağusa Wastewater Pumping Stations, Northern Cyprus

Revision of the wastewater pumping stations across the city: MCC and PLC panels, AC drive pump control, and a SCADA and telemetry infrastructure monitoring the stations from a single centre.

MCCPLCAC driveSCADATelemetryPartner: Temser Çelik
City-wide
pumping stations
Gazimağusa, Northern Cyprus
Temser Çelik

Package Treatment Systems

Compact PLC and HMI panels for containerised reverse osmosis package treatment systems. The panels were built in Istanbul and exported together with the system.

Compact panelPLCHMIExport
1,000 L/day
reverse osmosis
Export
Bolvadin Municipality

Bolvadin Wastewater Pumping Station

MCC and PLC panel of the pumping station: level-based control of three submersible pumps with runtime equalisation, gas detection (CH₄, H₂S, NH₃) and ventilation automation, operator panel and remote monitoring.

MCCPLCHMIGas detectionRemote monitoring
3 pumps
runtime-equalised control
Bolvadin
İLBANK

Sinop Solid Waste Mechanical Separation Facility

MCC and PLC panels, SCADA software and site electrical installation for a mechanical separation facility processing 25 tonnes of waste per hour.

MCCPLCSCADASite electrical installationPartner: SG Makina
25 tonnes/hour
separation capacity
Sinop

Bartın Solid Waste Mechanical Separation Facility

MCC and PLC panels, SCADA software and site electrical installation for a mechanical separation facility processing 25 tonnes of waste per hour.

MCCPLCSCADASite electrical installationPartner: Ünallar Makina
25 tonnes/hour
separation capacity
Bartın
Mir Global

Kayseri Biogas Plant

At the operating plant, the MCC panels were reorganised and the control logic improved. Technical service support was provided to the plant.

MCCControl logicTechnical servicePartner: Enviren Biogaz
Kayseri

Eskişehir Biogas Plant

PLC control, MCC panel and on-site commissioning of the desulphurisation unit that removes H₂S from the biogas.

DesulphurisationPLCMCCCommissioningPartner: Enviren Biogaz
Eskişehir
GÜBRETAŞ

Liquid Fertiliser Production: İzmir, İzmit, Tekirdağ

MDB, MCC and PLC panels for the liquid fertiliser production systems at three factories, with weighing load cell integration.

MDBMCCPLCLoad cell
3 factories
8 tonnes of liquid fertiliser production
İzmir · İzmit · Tekirdağ
Pirelli

İzmit Tyre Production Lines

Micron-level defect detection on tyre production lines using SICK sensors and industrial cameras, and revision of the existing PLC system.

SICK sensorsIndustrial cameraPLC revisionPartner: Körfeztek Teknoloji
İzmit
Assan Hanil

Press Lines

The PLC panels of 16 presses of 250 tonnes each were fully revised; the fixture and grip-and-release systems were rebuilt.

PLC panel revisionFixturesGrip-and-releasePartner: Körfeztek Teknoloji
16 × 250 tonnes
presses
Özata Shipyard

Sandblasting Facilities

MCC and PLC panels, HMI programming and site electrical installation for the shipyard's sandblasting facilities.

MCCPLCHMISite electrical installation
Camiş Ambalaj

Occupational Safety Automation

Monitoring of hazardous zones with SICK laser area scanners and implementation of safety scenarios.

SICK laser scannerSafety scenariosPartner: Körfeztek Teknoloji
Philip Morris International

Latvia and Estonia Factories

10 conveyor panels were built and exported for two factories.

Conveyor panelExportPartner: Flexkon Konveyör
10 panels
conveyor panels
Latvia · Estonia
Balkan Motor

Factory Distribution Boards

Revision of all main distribution boards (MDB) and sub-distribution boards across the factory.

MDBSub-distribution boards
Factory-wide
panel revision
Mondi

Corrugated Board Plant, İzmit

Revision of the plant's electrical infrastructure: neutral-earth separation, LOTO implementation and residual current relays.

Neutral-earth separationLOTOResidual current relayPartner: Körfeztek Teknoloji
İzmit
Rönesans Holding

Piazza Shopping Centre

PLC revision of 82 air handling units and their integration into the building management system (BMS), including VRV/VRF systems.

PLC revisionBMS integrationVRV/VRFPartner: Eneko Havalandırma
82 AHU
air handling units

Deliveries to 9 countries

Northern Cyprus, Latvia, Estonia, Poland, North Macedonia, France, Iraq, United Arab Emirates, Jordan

Do you have a similar project?

Tell us about your plant and the scope, and we will call you to arrange a site survey.

Quote form
CallWhatsAppRequest a quote